Pegatron endeavors to reduce the proportion of energy consumption per-unit in order to reduce our cost, to make a profit, and to enhance our competitive advantage and operational performance. Our energy saving project is implemented from both managerial and technical perspectives, including air-conditioning, power and water conservation.
(a) Air-conditioning:
1.
Installing a frequency conversion device for the air-conditioning.
2.
Changing air-conditioning operation timing mode from 24 hours to only when required.
3.
Conducting regular maintenance of the equipment.
4.
Setting mainframe booting mode to enhance the efficiency via BA.
5.
Adjusting ice-water temperature according to the ambient scenario.
6.
Installing time dependent controls for each floor.
(b)
Power System
1.
Installing time dependent electricity and lighting controls floor by floor.
2.
Improving the efficiency of electricity power.
3.
Changing low power efficiency equipment into high power efficiency ones.
4.
Implementing non-rush hours and off-days controls.
(c) Water System
1.
Installing water saving devices in stopcock.
2.
Setting water recycling system for toilet flushing and wall washing.
Pegatron sets targets and objectives for energy saving every year. From setting up the relevant compromise measures and conservation devices, the consumption of water, electricity and energy are reduced. In order to fulfill the vision of energy saving, we consider the whole layout, arrangements and facilities when building a new plant. |